Similar Posts
Irrigation Turn-on for 2020
The Wenatchee Reclamation District (WRD) begins filling their canal system on April 6, 2020. It takes a day or two for the water to travel from the Wenatchee River at Dryden, to and through Wenatchee, across the foot bridge into East Wenatchee, then finally to dump into the WRD’s canal here in East Wenatchee under the…
Important Decision and Water Turn-on for 2025
The CVTIA (Columbia View Terraces Irrigation Association) annual meeting for 2025 will take place on April 5, 2025 in Hank LuBean’s front yard (or porch) at 6:00 p.m. The meeting agenda will be on the CVTIA website (lubean.com/cvtia) and handed out at the meeting. Irrigation turn-on for 2025 will be on April 12, 2025 (the…
Check out the Water Use Charts for 2022
Water usage is still being tracked every week by Hank. Check out the latest uploaded pages here or click on the menu item labelled: ‘Latest Water Use Charts for 2022’.
All is well
The system is up and running with no known problems as of 7/21/23. The irrigation water quality has improved considerably since mid June. Ben and I have been cleaning the filters two and three times a week during the last of May and into June but beginning about July 1st, the need to clean filter…
Water Turn On for 2023 (Check the Recent Posts for latest system status)
The Wenatchee Reclamation District (WRD) begins filling their canal system on April 10, 2023. It takes a day or two for the water to travel from the Wenatchee River at Dryden, to and through Wenatchee, across the foot bridge into East Wenatchee, then finally to dump into the WRD’s canal here in East Wenatchee under the…
Valve Problem Update
On 4/23/23 a problem was encountered with the lateral valve feeding houses on Aurora (West side) and Anne (East side) from addresses 1600 to 1700. The problem is the lateral’s 3-inch gate valve started to leak from the valve body not the valve stem. The leaking problem is not able to be fixed without digging…
