Latest System Status or events, see: ‘Recent Posts’ on the left

Water Turn-on for 2026

The Wenatchee Reclamation District (WRD) begins filling their canal system on April 6, 2026. It takes a day or two for the water to travel from the Wenatchee River at Dryden, to and through Wenatchee, across the foot bridge into East Wenatchee, then finally to dump into the WRD’s canal here in East Wenatchee under the road (you can’t see it) at 9th and Eastmont. We let the water settle a bit for a day or two before we open the headgate to charge our system. We plan to charge our system by opening the headgate on Saturday April 11, 2026, at 10am, or possibly on Wednesday April 8, at 6pm, if enough folks are available to assist with the effort.

The annual meeting of the neighborhood just prior to the spring turn-on; is on Saturday, April 4, 2026 at 6pm in Hank’s yard at 1700 N. Aurora. The mailer that will be sent to each property owner or resident is below with additional information. Hank